Thursday, 14 August 2025
Green Earth Environmental Consultants 2025. 250708006073: The operation of an abattoir (Indraai Abattoir) on the Remainder of Portion 87 of Farm Brakwater No. 84, Windhoek, Khomas Region.WASTE MANAGEMENT, TREATMENT, HANDLING AND DISPOSAL ACTIVITIES 2.1 The construction of facilities for waste sites, treatment of waste and disposal of waste. 2.2 Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. 2.3 The import, processing, use and recycling, temporary storage, transit or export of waste.
Monday, 4 August 2025
Green Earth Environmental Consultants 2025. 250717006132: The rezoning of Portion 26 (A Portion of Portion 6) of Farm Döbra No. 49, Windhoek, Khomas Region from 'residential' with a density of 1 dwelling per 5 ha to 'restricted business' with a bulk of 0,75 and for the alignment and construction of public roads.LAND USE AND DEVELOPMENT ACTIVITIES 5.1 The rezoning of land from residential use to industrial or commercial use; INFRASTRUCTURE 10.1 The construction of- (b) public roads; 10.2 The route determination of roads and design of associated physical infrastructure where - (a) It is a public road (b) the road reserve is more than 30m wide, or (c) the road caters for more than one lane of traffic in both directions.
Monday, 21 July 2025
Green Earth Environmental Consultants 2025. 241015004816: The creation of public roads and subdivision of the Remainder of Farm Oamites No. 53 Windhoek into 86 Portions and Remainder.LAND USE AND DEVELOPMENT ACTIVITIES 5.2 Establishment of land resettlement schemes INFRASTRUCTURE 10.1 The construction of- (b) public roads; 10.2 The route determination of roads and design of associated physical infrastructure where - (a) It is a public road (b) the road reserve is more than 30m wide, or (c) the road caters for more than one lane of traffic in both directions.
Monday, 7 July 2025
Green Earth Environmental Consultants 2025. 250522005830: The rezoning of Portion 15 of Farm Usakos West No. 65, Usakos, Erongo Region: The creation of public roads and to use it for fuel storage and handling (Truck Port) facilities.LAND USE AND DEVELOPMENT ACTIVITIES 5.1 The rezoning of land from residential use to commercial. HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE 9.4 The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location.
Thursday, 22 May 2025
Green Earth Environmental Consultants 2025. 250425005757: Environmental Impact Assessment renewal for the completion of the town planning procedures for the creation of an Erf for a Service Station, a rural residential and nature state, business erven and street portions on the Remainder of Portion 1 of Farm Gross Haigamas No. 447, Khomas Region.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES 1. The construction of facilities for - (a) the generation of electricity. (b) the transmission and supply of electricity. WASTE MANAGEMENT, TREATMENT, HANDLING AND DISPOSAL ACTIVITIES 2.1 The construction of facilities for waste sites, treatment of waste and disposal of waste. 2.2 Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. 2.3 The import, processing, use and recycling, temporary storage, transit or export of waste.
Friday, 9 May 2025
Green Earth Environmental Consultants 2025. 250318005537: To align and create right of way servitudes and access roads for the newly created Portions from the subdivision of Portion 59 of Farm Osona Commonage No. 65, Okahandja, Otjozondjupa Region into 25 Portions and the Remainder.INFRASTRUCTURE The construction of: - Public roads. The route determination of roads and design of associated physical infrastructure where: - It is a public road; - The road reserve is wider than 30 meters; - The road caters for more than one lane of traffic in both directions.
Wednesday, 7 May 2025
Green Earth Environmental Consultants 2025. 250402005588: The closure of Portion A of Erf 931, Lüderitz as public open space and consolidation of Portion A with Erf 808, Lüderitz, ǁKaras Region.LAND USE AND DEVELOPMENT ACTIVITIES: The rezoning of land from use for nature conservation or zoned open space to any other land use.
Friday, 25 April 2025
Green Earth Environmental Consultants 2025. 250318005530: To create right of way servitudes and access roads and for the subdivision of the Remainder of Portion 82 of the Farm Osona Commonage No. 65 into 87 Portions and the Remainder, Otjozondjupa Region.INFRASTRUCTURE The construction of: - Public roads. The route determination of roads and design of associated physical infrastructure where: - It is a public road; - The road reserve is wider than 30 meters; - The road caters for more than one lane of traffic in both directions.
Wednesday, 23 April 2025
Green Earth Environmental Consultants 2025. 250319005538: The completion of the town planning procedures for the rezoning of Erf 2750 (Consolidated Erven 1225 1226), Ondangwa Extension 3, Oshana Region.LAND USE AND DEVELOPMENT ACTIVITIES The rezoning of land from residential use to industrial or commercial use.
Tuesday, 1 April 2025
Green Earth Environmental Consultants 2025. 250310005503: The renewal of the Environmental Clearance for the Rezoning of Erf 1069, Outjo (Kunene Region) from 'municipal' to 'general business' Kunene Region.LAND USE AND DEVELOPMENT ACTIVITIES The rezoning of land previously used for 'local authority' purposes to 'general business' so that it can be used for commercial purposes.
Friday, 28 March 2025
Green Earth Environmental Consultants 2025. 250312005514: The renewal of the Environmental Clearance for the rezoning of Erf 1069, Outjo (Kunene Region) from 'local authority' to 'general business' Kunene Region.LAND USE AND DEVELOPMENT ACTIVITIES - The rezoning of land previously used for 'local authority' purposes to 'general business' so that it can be used for commercial purposes.
Friday, 21 March 2025
Green Earth Environmental Consultants 2025. 250305005481: Renewal of the Environmental Clearance for the Decommissioning of the current dumping/landfill site located on a Portion of Portion C of Farm Keikanachab Ost No. 89, Mariental, Hardap Region.WASTE MANAGEMENT, TREATMENT, HANDLING AND DISPOSAL ACTIVITIES - The construction of facilities for waste sites, treatment of waste and disposal of waste. - Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. - The import, processing, use and recycling, temporary storage, transit or export of waste.
Friday, 21 March 2025
Green Earth Environmental Consultants 2025. 250305005482: The renewal of the Environmental Clearance for the construction and operation of a landfill site located on a Portion of Portion C of Farm Keikanachab Ost No. 89, Mariental, Hardap Region.WASTE MANAGEMENT, TREATMENT, HANDLING AND DISPOSAL ACTIVITIES - The construction of facilities for waste sites, treatment of waste and disposal of waste. - Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. - The import, processing, use and recycling, temporary storage, transit or export of waste.
Wednesday, 19 March 2025
Green Earth Environmental Consultants 2025. 250218005382: To create 'public roads' in the form of right of way servitudes over Portion 14 of the Remainder of Portion 6 of the Farm Otjiwarongo Townlands No. 18 (Otjozondjupa Region).INFRASTRUCTURE The construction of: - Public roads. The route determination of roads and design of associated physical infrastructure where: - It is a public road; - The road reserve is wider than 30 meters; - The road caters for more than one lane of traffic in both directions.
Wednesday, 12 March 2025
Green Earth Environmental Consultants 2025. 250217005372: To create 'public roads' over the Remainder of Farm Woodway No. 499 to extend the right of way access to Portions 5 to 7 and the Remainder of Farm Woodway No. 499 (Khomas Region).INFRASTRUCTURE The construction of: - Public roads. The route determination of roads and design of associated physical infrastructure where: - It is a public road; - The road reserve is wider than 30 meters; - The road caters for more than one lane of traffic in both directions.
Monday, 10 March 2025
Green Earth Environmental Consultants 2025. 250213005364: To create 'public roads' over Portion 1 of the Farm Paulinenhof No. 492 to extend the right of way access to Portions 2 to 5 and the Remainder of Portion 1 of Farm Paulinenhof No. 492 (Khomas Region).INFRASTRUCTURE The construction of: - Public roads. The route determination of roads and design of associated physical infrastructure where: - It is a public road; - The road reserve is wider than 30 meters; - The road caters for more than one lane of traffic in both directions.
Wednesday, 5 March 2025
Green Earth Environmental Consultants 2025. 250123005214: Environmental Impact Assessment for the construction and operation of a bulk liquid fuel storage and handling facility (terminal) on Erf 1582, Walvis Bay, Erongo Region.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES - The construction of facilities for the refining of gas, oil and petroleum products. HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
Monday, 24 February 2025
Green Earth Environmental Consultants 2025. 250110005170: Fuel storage and handling facilities on Erven 4446 and 4447, Walvis Bay (Extension 12), Erongo Region.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES - The construction of facilities for the refining of gas, oil and petroleum products. HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
Sunday, 9 February 2025
Green Earth Environmental Consultants 2025. 241213005079: Renewal for the rezoning of the Remainder of Portion 6 (A portion of Portion 2) of Farm Döbra No. 49, Windhoek, Khomas Region, from 'residential' with a density of 1 dwelling per 5ha to 'restricted business' with a bulk of 0,5 and for the alignment and construction of public roads.LAND USE AND DEVELOPMENT ACTIVITIES 5.1 The rezoning of land from residential use to industrial or commercial use; INFRASTRUCTURE 10.1 The construction of- (b) public roads; 10.2 The route determination of roads and design of associated physical infrastructure where - (a) It is a public road (b) the road reserve is more than 30m wide, or (c) the road caters for more than one lane of traffic in both directions.
Monday, 30 December 2024
Green Earth Environmental Consultants 2024. 241114004965: Township establishment procedures for the proclamation of Schlip, Hardap Region, as a town.LAND USE AND DEVELOPMENT ACTIVITIES 5.2 Establishment of land resettlement schemes INFRASTRUCTURE 10.2 The route determination of roads and design of associated physical infrastructure where - a) It is a public road b) The road reserve is more than 30m wide, or c) The road caters for more than one lane of traffic in both directions.
Monday, 30 December 2024
Green Earth Environmental Consultants 2024. 240701004092: Construct and operate a Green Energy Complex (including a 300,000 bpsd oil refinery, 500mw renewable energy power plant and related storage tank farms) on Portion 46 of the Remainder of Farm 58 Walvis Bay, Erongo Region.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES The construction of facilities for: (a) the generation of electricity. (b) the transmission and supply of electricity. (c) refining of gas, oil and petroleum products.
Wednesday, 4 December 2024
Green Earth Environmental Consultants 2024. 241113004952: Fuel storage and handling facilities of Erf 132, Lafrenz, Windhoek, Khomas Region.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES - The construction of facilities for the refining of gas, oil and petroleum products. HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
Tuesday, 19 November 2024
Green Earth Environmental Consultants 2024. 241015004810: The establishment of a Township (the Otjomuise Police Village) on Portion X of Windhoek Town and Townlands No. 31, Windhoek, Khomas Region.LAND USE AND DEVELOPMENT ACTIVITIES 5.2 Establishment of land resettlement schemes INFRASTRUCTURE 10.2 The route determination of roads and design of associated physical infrastructure where - a) It is a public road b) The road reserve is more than 30m wide, or c) The road caters for more than one lane of traffic in both directions.
Friday, 20 September 2024
Green Earth Environmental Consultants 2024. 240809004538: The rezoning of Erf 1139, Oranjemund Extension 3, from 'Single Residential' with a density of 1:600 to 'Office' with a bulk of 1.5 //Karas Region.LAND USE AND DEVELOPMENT ACTIVITIES The rezoning of land from residential use to industrial or commercial use.
Wednesday, 28 August 2024
Green Earth Environmental Consultants 2024. 240702004108: The construction and operation of a lodge and campsite in the Buffalo Core Area of the Bwabwata National Park in the Kavango East Region.TOURISM DEVELOPMENT ACTIVITIES 6. The construction of resorts, lodges, hotels or other tourism and hospitality facilities. OTHER ACTIVITIES 11.2 Construction of cemeteries, camping, leisure and recreation sites.
Tuesday, 27 August 2024
Green Earth Environmental Consultants 2024. 240809004537: The renewal of the Environmental Clearance for the operation of facilities and storage and handling of petroleum products on Erf 3447, Walvis Bay, Erongo Region.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES - The construction of facilities for the refining of gas, oil and petroleum products. HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
Wednesday, 21 August 2024
Green Earth Environmental Consultants 2024. 240726004464: To create 'public roads' over the remainder of Farm Katima Mulilo Townlands No. 1328 to provide access to Portion 115 of the Remainder of Katima Mulilo Townlands No. 1328 (Zambezi Region).INFRASTRUCTURE The construction of: - Public roads. The route determination of roads and design of associated physical infrastructure where: - It is a public road; - The road reserve is wider than 30 meters; - The road caters for more than one lane of traffic in both directions.
Wednesday, 21 August 2024
Green Earth Environmental Consultants 2024. 240725004446: Environmental Impact Assessment renewal for the storage and handling of oil and petroleum products and the materials recovery facility of Rent-a-Drum on Portion S of Windhoek Town and Townlands No. 31, Windhoek, Khomas Region.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES - The construction of facilities for the refining of gas, oil and petroleum products. HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
Monday, 5 August 2024
Green Earth Environmental Consultants 2024. 240513003588: The construction and operation of a lodge in the Hobatere Roadside Concession, Kunene Region.TOURISM DEVELOPMENT ACTIVITIES 6. The construction of resorts, lodges, hotels or other tourism and hospitality facilities. OTHER ACTIVITIES 11.2 Construction of cemeteries, camping, leisure and recreation sites.
Thursday, 18 July 2024
Green Earth Environmental Consultants 2024. 240607003967: The construction and operation of a cattle abattoir on a portion of Portion 7 of Farm Klein Okapuka No. 51, Windhoek, Khomas Region.WASTE MANAGEMENT, TREATMENT, HANDLING AND DISPOSAL ACTIVITIES - The construction of facilities for waste sites, treatment of waste and disposal of waste. - Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. - The import, processing, use and recycling, temporary storage, transit or export of waste. FORESTRY ACTIVITIES The clearance of forest areas, deforestation, aforestation, timber harvesting or any other related activity that requires authorisation in term of the Forest Act, 2001 (Act No. 12 of 2001) or any other law.
Tuesday, 9 July 2024
Green Earth Environmental Consultants 2024. 240419003294: The rezoning of Portion A and Portion 205 of the Remainder of Okahandja Townlands No. 277, the consolidation of Portion A and 205 and the operation of the Beefcor Abattoir on consolidated Portions A and 205.WASTE MANAGEMENT, TREATMENT, HANDLING AND DISPOSAL ACTIVITIES - The construction of facilities for waste sites, treatment of waste and disposal of waste. - Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. - The import, processing, use and recycling, temporary storage, transit or export of waste. LAND USE AND DEVELOPMENT ACTIVITIES - The rezoning of land for industrial or commercial use; ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES The construction of facilities for - The generation of electricity.
Wednesday, 26 June 2024
Green Earth Environmental Consultants 2024. 240531003891: Renewal for the operation of facilities and storage and handling of oil and petroleum products (diesel) and for the materials recovery facility of Rent-a-Drum on Farm 262 of the Farm Swakopmund Town and Townlands No. 41, Erongo Region.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES - The construction of facilities for the refining of gas, oil and petroleum products. HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
Wednesday, 15 May 2024
Green Earth Environmental Consultants 2024. 240419003295: The construction of a new 33kV powerline from Solitaire to Namib Desert Lodge in the Hardap Region.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES The construction of facilities for - (b) the transmission and supply of electricity.
Thursday, 25 April 2024
Green Earth Environmental Consultants 2024. 240404003141: Environmental Impact Assessment renewal for the operations and increase of water abstraction of Oshivelo Farming, Oshivelo, Oshikoto Region.AGRICULTURE AND AQUACULTURE ACTIVITIES 7.3 The genetic modification of any organism with the purpose of fundamentally changing the inherent characteristics of that organism. 7.4 The import, processing and transit of genetically modified organisms. 7.5 Pest control. 7.6 The release of genetically modified organisms into the environment where an environmental assessment is required by law. 7.7 The release of any organism outside its natural area of distribution that is to be used for biological pest control. 7.8 The introduction of alien species into local ecosystems.
Monday, 22 April 2024
Green Earth Environmental Consultants 2024. 240328003125: Environmental Impact Assessment for the operations of Omaruru Game Lodge, Erongo Region.TOURISM DEVELOPMENT ACTIVITIES 6. The construction of resorts, lodges, hotels or other tourism and hospitality facilities. OTHER ACTIVITIES 11.2 Construction of cemeteries, camping, leisure and recreation sites.
Tuesday, 2 April 2024
Green Earth Environmental Consultants 2024. 240307002965: Renewal of the Environmental Clearance for the operations of Namib Poultry Broiler and Abattoir on a portion of Portion 7 of Farm Klein Okapuka No. 51.WASTE MANAGEMENT, TREATMENT, HANDLING AND DISPOSAL ACTIVITIES 2.1 The construction of facilities for waste sites, treatment of waste and disposal of waste. 2.2 Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. 2.3 The import, processing, use and recycling, temporary storage, transit or export of waste.
Monday, 1 April 2024
Green Earth Environmental Consultants 2024. 240312003057: Renewal of the Environmental Clearance for the construction and operation of a sewerage treatment plant in Oshakati, Oshana Region.WASTE MANAGEMENT, TREATMENT, HANDLING AND DISPOSAL ACTIVITIES 2.1 The construction of facilities for waste sites, treatment of waste and disposal of waste. 2.2 Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. 2.3 The import, processing, use and recycling, temporary storage, transit or export of waste. WATER RESOURCE DEVELOPMENTS 8.6 Construction of industrial and domestic wastewater treatment plants and related pipeline systems.
Monday, 4 March 2024
Green Earth Environmental Consultants 2024. 240130002733: The Agricultural Food Sustaibability Project to be located on a portion of the Townlands of Tsumkwe Settlement, Otjozondjupa Region.AGRICULTURE AND AQUACULTURE ACTIVITIES 7.5 Pest control. 7.8 The introduction of alien species into local ecosystems. WATER RESOURCE DEVELOPMENTS 8.1 The abstraction of ground or surface water for industrial or commercial purposes. 8.2 The abstraction of groundwater at a volume exceeding the threshold authorised in terms of a law relating to water resources. 8.5 Construction of dams, reservoirs, levees and weirs. 8.7 Irrigation schemes for agriculture excluding domestic irrigation.
Monday, 4 March 2024
Green Earth Environmental Consultants 2024. 240130002742: The design, supply, installation, construction and commissioning of a new potable water treatment plant for Tsumeb, Oshikoto Region.WATER RESOURCE DEVELOPMENTS 8.6 Construction of industrial and domestic wastewater treatment plants and related pipeline systems. HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE 9.1 The manufacturing, storage, handling or processing of a hazardous substance defined in the Hazardous Substances Ordinance, 1974.
Thursday, 28 December 2023
Green Earth Environmental Consultants 2023. 231207002552: The establishment of a township on Portions 1 and 2 (Portions of Portion 118) of the Remainder of Farm Rundu Townlands No. 1329, Rundu, Kavango East Region.LAND USE AND DEVELOPMENT ACTIVITIES 5.2 Establishment of land resettlement schemes. ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES 1. The construction of facilities for - (b) the transmission and supply of electricity; WATER RESOURCE DEVELOPMENTS 8.6 Construction of industrial and domestic wastewater treatment plants and related pipeline systems.
Thursday, 28 December 2023
Green Earth Environmental Consultants 2023. 231208002554: The rezoning of Portion S of Farm Osona Commonage No. 65, Okahandja, Otjozondjupa Region from 'Agriculture' to 'general Business'.LAND USE AND DEVELOPMENT ACTIVITIES The rezoning of land from agricultural use to industrial use. TOURISM DEVELOPMENT ACTIVITIES The construction of resorts, lodges, hotels or other tourism and hospitality facilities. WATER RESOURCE DEVELOPMENTS The abstraction of ground or surface water for industrial or commercial purposes. The abstraction of groundwater at a volume exceeding the threshold authorised in terms of a law relating to water resources.
Thursday, 28 December 2023
Aligned Sustainability & Environmental Consultants (ASEC) 2023. 231212002560: Environmental Impact Assessment (EIA) Report to support the application for Environmental Clearance Certificate (ECC) for Exclusive Prospecting License (EPL) No. 8413 in the //Karas Region.The Proponet Plans to conduct prospecting Exploration activities, leading to the estimation and delineation of the target resources.Prospecting and exploration form part of the listed activities under the Environmental Management Act (EMA) (2007) and the 2012 EIA 1. The construction of facilities for any process or activities which requires a license, right or other form of authorization (Propecting and Mining Act, 1992). 2. Mining or extraction of any natural resources, whether regulated by law or not. 3. Resource extraction, manupulation, conservation, and related activities.
Friday, 15 December 2023
Green Earth Environmental Consultants 2023. 231130002535: Renewal of the Environmental Clearance for the operation of a photovoltaic (solar) plant and overhead powerlines on a portion of Portion 7 of farm Klein Okapuka No. 51.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES 1. The construction of facilities for - (a) the generation of electricity; (b) the transmission and supply of electricity.
Wednesday, 6 December 2023
Green Earth Environmental Consultants 2023. 231121002500: Fuel storage and handling facilities on Erf 1876, Lüderitz, //Karas Region.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES - The construction of facilities for the refining of gas, oil and petroleum products. HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
Friday, 24 November 2023
Green Earth Environmental Consultants 2023. 231109002445: The Materials Recovery Facility of Rent-a-Drum on Erf 6253, Walvis Bay Extension 19, Erongo Region.WASTE MANAGEMENT, TREATMENT, HANDLING AND DISPOSAL ACTIVITIES 2.1 The construction of facilities for waste sites, treatment of waste and disposal of waste. 2.2 Any activity entailing a scheduled process to in the Atmospheric Pollution Prevention Ordinance, 1976. 2.3 The import, processing, use and recycling, temporary storage, transit or export of waste. HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE 9.1 The manufacturing, storage, handling or processing of a hazardous substance defined in the Hazardous Substances Ordinance, 1974.
Friday, 17 November 2023
Green Earth Environmental Consultants 2023. 231031002389: Renewal for the rezoning of Portion 387 of Portion 70 of Farm Brakwater No. 48 from 'Residential' to 'Industrial' and for the alignment and construction of the arterial road
.LAND USE AND DEVELOPMENT ACTIVITIES 5.1 The rezoning of land from residential use to industrial or commercial use; INFRASTRUCTURE 10.1 The construction of- (b) public roads; 10.2 The route determination of roads and design of associated physical infrastructure where - (a) It is a public road (b) the road reserve is more than 30m wide, or (c) the road caters for more than one lane of traffic in both directions.
Monday, 13 November 2023
Green Earth Environmental Consultants 2023. 231024002366: Application for renewal and transfer of ECC for the establishment of a lodge at Kwando North Campsite in Bwabwata National Park, Zambezi Region
.For the ECC renewal and transfer from Return Africa (Pty) Ltd to A.S.S Investments Fifty Four cc.
Monday, 23 October 2023
Green Earth Environmental Consultants 2023. 231004002220: Renewal of the Environmental Clearance Certificate for the closure of Portion A of Erf 2588 (Mulderine Street) as street, the creation of Portion B of Erf 2590 as street and the construction of facilities and storage and handling of petroleum products on Erven 2589 and 2590, Walvis Bay.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES - The construction of facilities for the refining of gas, oil and petroleum products; HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
Monday, 23 October 2023
Green Earth Environmental Consultants 2023. 231004002218: Environmental Impact Assessment renewal for the proposed construction of facilities and storage and handling of oil and petroleum products in Ariamsvlei, //Kharas Region.ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES - The construction of facilities for the refining of gas, oil and petroleum products; HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
Tuesday, 10 October 2023
Green Earth Environmental Consultants 2023. 230925002142: Renewal of the Environmental Impact Assessment to undertake exploration and small-scale test mining activities for precious stones, precious metals and base and rare metals on Exclusive Prospecting Licence (EPL) 6952, Katima Mulilio, Zambezi Region.MINING AND QUARRYING ACTIVITIES 3.1 The construction of facilities for any process or activities which requires a license, right or other form of authorisation, and the renewal of a license, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities.