These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
| Attachment | Size | 
|---|---|
| 5884_EMP_Filling station in Kamanjab.pdf | 299.56 KB | 
| 5884_Declaration of Authorship_Filling station in Kamanjab.pdf | 206.31 KB | 
| 5884_No Written Notice_Filling station in Kamanjab.pdf | 41.84 KB | 
| 5884_Map_Filling station in Kamanjab.pdf | 180.79 KB | 
| 5884_Screening Notice_Filling station in Kamanjab.pdf | 74.18 KB | 
| 5884_CV_Filling station in Kamanjab.pdf | 277.82 KB | 
The environmental clearance is required for the proposed offshore oil bunkering project within the Exclusive Economic Zone (EEZ) of Namibia. It ensures that the proposed offshore oil bunkering project is planned and implemented in an environmentally responsible manner, with the necessary approvals and stakeholder input.
Environmental Clearance Certificate for proposed construction and operation of a filling station at Tsitsabis, Oshikoto Region.
Environmental Clearance Certificate for mining activities on Mining Claim No's: 73401, 73399, 73400, 73396, 73397, 73398 at Khorixas, Kunene Region.
Environmental Scoping Assessment (ESA) for the proposed Construction of infrastructure and operation of an Abattoir on Portion 1 of Otjiwarongo Portion 15 NIDA Industrial Park, Otjiwarongo, Otjozondjupa Region, Namibia. The proposed abattoir will be a modern, state-of-the-art micro-slaughterhouse facility designed to process up to 8 cattle per day, 5 goats per day, 5 sheep per day and 10 pigs per week.
Environmental Clearance Certificate for proposed rezoning of Block 90 Okongo, Ohangwena Region.
ECC for construction and operations of a filling station at Drimiopsis Omaheke Region.
ECC for construction and operations of a warehouse for marble stones in Walvis Bay Erongo Region.
Quintessential Trading and Consultancy Pty Ltd has been instructed by the Municipality of Swakopmund to undertake all the statutory procedures to subdivide and rezone Public Open Spaces Erf 231 measuring; 2556 sqm and Erf 233 measuring 6261 sqm located at; Matutura Proper/Block 18 a Portion of 141 ( A Portion of Portion 137) of the Farm Swakpomund Town and Townlands No 41 in the Municipality of Swakopmund measuring 22,4518 hectares, comprising of 233 erven (numbered 1-230, 3 public spaces numbered 231-233, Institutional and Remainder Streets.
ECC for Construction and operations of a truck port and filling station at B6 road, Trans Kalahari Highway, Gobabis in Omaheke Region.
ECC for the operations of an existing filling station at Aranos, Hardap Region.
ECC for construction and operation of a filling station.
The MET has approved and issued the following ECC's to the Swakopmund Municipality; -ECC Renewal: Environmental Clearance Certificate for the Township Establishment on Block 23, Matutura, Remainder of Portion 5 of Swakopmund Town and Townlands No.41 Erongo Region - 20 April 2017 -Environmental Clearance for the Environmental Baseline Assessment for the Proposed township establishment on Portions A, B and C of the Remainder of Portion B of Swakopmund Town and Townlands No 41, Erongo Region -21 May 2014 -Environmental Clearance for the Formalisation of DRC Informal Settlement, Township Establ
Acer Petroleum Pty Ltd applies for an ECC for Operation of an Existing Filling Station in Leonardville, Omaheke Region 128 KM from Gobabis.
The ECC is for practicing agricultural activities cash crop farming, horticulture.
ECC for construction and operation of a filling station at Onankali.
Construction and operation of a filling station.
ECC for construction and operation of a filling station.
ECC for construction of a campsite.
Installation and manufacturing,storage and exportation of plastic pellets.
| Attachment | Size | 
|---|---|
| 1287_Scoping Report_Manufacturing plastic pellets.pdf | 3.22 MB | 
| 1287_EMP_Manufacturing plastic pellets.pdf | 70.28 KB | 
| 1287_Letter of consent_Manufacturing plastic pellets.pdf | 384.01 KB | 
| 1287_Public Consultation_Manufacturing plastic pellets.pdf | 645.59 KB | 
| 1287_Map_Manufacturing plastic pellets.pdf | 139.56 KB |