These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The environmental clearance is required for the proposed offshore oil bunkering project within the Exclusive Economic Zone (EEZ) of Namibia. It ensures that the proposed offshore oil bunkering project is planned and implemented in an environmentally responsible manner, with the necessary approvals and stakeholder input.
Environmental Clearance Certificate for proposed construction and operation of a filling station at Tsitsabis, Oshikoto Region.
Environmental Clearance Certificate for mining activities on Mining Claim No's: 73401, 73399, 73400, 73396, 73397, 73398 at Khorixas, Kunene Region.
Environmental Clearance Certificate for proposed rezoning of Block 90 Okongo, Ohangwena Region.
ECC for construction and operations of a filling station at Drimiopsis Omaheke Region.
ECC for construction and operations of a warehouse for marble stones in Walvis Bay Erongo Region.
ECC for Construction and operations of a truck port and filling station at B6 road, Trans Kalahari Highway, Gobabis in Omaheke Region.
ECC for the operations of an existing filling station at Aranos, Hardap Region.
ECC for construction and operation of a filling station.
Acer Petroleum Pty Ltd applies for an ECC for Operation of an Existing Filling Station in Leonardville, Omaheke Region 128 KM from Gobabis.
Embwinda Fishing (Pty) Ltd, hereinafter referred to as the proponent, has applied for a Wastewater (Effluent) Discharge License, hereinafter referred to as the activity, in terms of Section 72 (1) of the Water Resources Management Act (Act No. 11 of 2013) (Government Gazette No. 5367, 19 December 2013) through the Ministry of Agriculture, Water and Forestry (MAWF). The proponent is required to submit an environmental impact analysis in terms of the Section 72 (2) and (3) of the Water Resources Management Act, Act 11 of 2013.
The ECC is for practicing agricultural activities cash crop farming, horticulture.
ECC for construction and operation of a filling station at Onankali.
Construction and operation of a filling station.
ECC for construction and operation of a filling station.
ECC for construction of a campsite.
Installation and manufacturing,storage and exportation of plastic pellets.
Attachment | Size |
---|---|
1287_Scoping Report_Manufacturing plastic pellets.pdf | 3.22 MB |
1287_EMP_Manufacturing plastic pellets.pdf | 70.28 KB |
1287_Letter of consent_Manufacturing plastic pellets.pdf | 384.01 KB |
1287_Public Consultation_Manufacturing plastic pellets.pdf | 645.59 KB |
1287_Map_Manufacturing plastic pellets.pdf | 139.56 KB |