These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The Environmental Clearance Certificate (ECC) is required to ensure the lawful continuation of sand mining operations at Erf 2383, located in the Katima District, Zambezi Region. The ECC serves as a mandatory compliance instrument under the Environmental Management Act, 2007 (Act No. 7 of 2007), confirming that the project adheres to national environmental regulations and enabling the proponent to carry out sand mining activities in accordance with approved environmental management measures.
The ECC is required in order to commence with the construction of the fuel retail facility.
The proposed development of the Otjimbingwe Service Station. The project entails the construction of a standard service station with 4 dispensing pumps (petrol and diesel) with 3 double walled Underground Storage Tanks of 45 cubic meters. The service station will also have a canopy covered forecourt, ablutions, tyre fitment and oil changing facilities, convenience store and street upgrading in order to provide safe access to the proposed service station.
| Attachment | Size |
|---|---|
| 789_EIA_Otjimbingwe Service Station.pdf | 2.71 MB |
| 789_EMP_Otjimbingwe Service Station.pdf | 549.35 KB |
| 789_Consent_Otjimbingwe Service Station.pdf | 435.53 KB |
| 789_Proof of Consultation_Otjimbingwe Service Station.pdf | 675.8 KB |
| 789_Map_Otjimbingwe Service Station.pdf | 251.9 KB |
| 789_Screening Notice_Otjimbingwe Service Station.pdf | 175.42 KB |
The proponent has been granted provisional rights to the Exclusive Prospecting License no 8325 pending an ECC. The ECC is therefore required to commence with exploration studies on the EPL and solidify the proponent's rights to the EPL.
| Attachment | Size |
|---|---|
| 3762_EMP_EPL No 8325 in Omaruru District.pdf | 755.84 KB |
| 3762_SR_EPL No 8325 in Omaruru District.pdf | 5.56 MB |
| 3762_Proof of Consultation_EPL No 8325 in Omaruru District.pdf | 1.48 MB |
| 3762_Map_EPL No 8325 in Omaruru District.pdf | 384.83 KB |
| 3762_Screeing Notice_EPL No 8325 in Omaruru District.pdf | 62.7 KB |
The proposed development of the AK Service Station - Kuisebmund is planned for Erf 7214, Khomashochland street, Extension 5, Kuisebmund, Walvis Bay situated on GPS Position: 22°55'30.5"S 14°32'25.7"E. The envisioned project entails the construction of a fuel/service station with four dispensing pumps (petrol and diesel) with 3 double walled Underground Storage Tanks of 45 cubic metres.
ECC is required for the commencement of the construction and operation of the proposed Bitumen processing plant. There ECC was issued on 01 April 2016, however, it expired before any activity could commence. The proponent, therefore, wants a renewal of the initial issued ECC in order to commence with the project.
| Attachment | Size |
|---|---|
| 2740_EMP_Proposed bitumen processing plant project_Windhoek.pdf | 729.25 KB |
| 2740_ECC_Proposed bitumen processing plant project_Windhoek.pdf | 413.66 KB |
| 2740_Map_Proposed bitumen processing plant project_Windhoek.pdf | 578.17 KB |
The proposed development of the Onankali Service Station is planned for a parcel of land situated on GPS Position: 18°11'16.3"S 16°22'43.2"E. The envisioned project entails the construction of a standard service station with three dispensing pumps (petrol and diesel) with 3 double walled Underground Storage Tanks of 45 cubic metres with 5 compartments, a canopy covered forecourt, ablutions, tyre fitment & spares centre, convenience store and street upgrading in order to provide safe access to the proposed service station.