Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 36 of 36
Wednesday, 17 September 2025
A. Speiser Environmental Consultants 2025. 250902006350: Renewal of ECC for EPL 6605 exploration activities located east of the Namib Naukluft National Park - overlapping the Erongo and Khomas Regions.
The ECC was granted for exploration activities on EPL 6605 This is a renewal application for EPL 6605.
Wednesday, 17 September 2025
A. Speiser Environmental Consultants 2025. 250902006349: Renewal of ECC for exploration activities on EPL 5796 located in the Namib Naukluft National Park.
The ECC is for exploration activities on EPL 5796. This is a renewal application, the current ECC is attached on Form 1.
Sunday, 9 February 2025
A. Speiser Environmental Consultants 2025. 240918004693: Environmental Impact Assessment (Scoping Report, including Impact Assessment and EMP) for the proposed acid storage and handling facilities for the Cooperative Bulk Handling Terminal in the Port of Walvis Bay.

Nature of Activity: Construction and operation (logistical management of importing and exporting materials, including sulphuric acid, an essential reagent in the mining industry's extraction of uranium (U3O8)) of the sulphuric acid storage and handling facility at Walvis Bay harbor (see Appendix A). Please refer to the background information document (BID) in Appendix B for further details. Location of Activity: Construction of a sulphuric acid storage and handling facilities at the Walvis Bay Port including transport from the WB Port to the Etango Mine (see Appendix A).

Wednesday, 7 August 2024
A. Speiser Environmental Consultants 2024. 240723004434: Renewal for ECC 01582 on EPL 6762 for exploration activates in Erongo Region.
Renewal for ECC 01582 on EPL 6762 for exploration activates.
Friday, 16 February 2024
Trinity Environmental Solutions 2024. 240201002760: Quagga Camp and Leisure.

Construction of an eco-friendly low impact tourism and leisure facility on a 15ha plot in Ozondati Village, Ohungu Conservancy (Erongo Region).

Tuesday, 23 January 2024
Trinity Environmental Solutions 2024. 231219002620: Construction to Gravel Standard DR3417: Andara via Mangamba to Shamaturu (15km).

For the upgrading of an earth track already proclaimed as DR3417, from Andara Village to Shamaturu Village's clinic, via Mangamba Village. This is a 15km long road with a 30 meters wide road reserve, therefore total project footprint will be less than 50 hectares.

Monday, 6 November 2023
A. Speiser Environmental Consultants 2023. 231011002247: Amendment to the existing EIA and EMP for the Mining Licence 39 - change of mining method and processing plant at Rosh Pinah Zinc Corporation's Mine - RP2.0 expansion project.

Amendment to the existing EIA and EMP for the Mining Licence 39 - change of mining method and processing plant at Rosh Pinah Zinc Corporation's Mine - RP2.0 expansion project.

Friday, 8 September 2023
Trinity Environmental Solutions 2023. 230825002047: Renewal of ECC for operations and management Ondjamba Hills Camp in Erongo Region.

Renewal of the existing Environmental Clearance Certificate 2. Change of project name from Elephant Ridge Camp to Ondjamba Hills.

Sunday, 16 July 2023
A. Speiser Environmental Consultants 2023. 230619001583: ECC for RPZC storage and loading of zinc and lead at Lüderitz Harbor, //Karas Region.

ECC for RPZC storage and loading of zinc and lead at Lüderitz Harbor. Renewal of the ECC issued on 2020-07-19. Valid until 2023-07-19.

Tuesday, 16 May 2023
A. Speiser Environmental Consultants 2023. 230428001407: Renewal application: Small scale mining activities on ML135 in Kunene Region.

Continuation of: The small-scale extraction of semi-precious stones through controlled blasting and excavations. ML 135 is located in the Sarusus area within the Skeleton Coast Park, approximately 74 km north-west of Mowe Bay, north of the Khumib River, approximately 3 km inland from the coast. The mining license covers an area of ±1 560 ha.

Monday, 13 February 2023
A. Speiser Environmental Consultants 2023. 230119000849: Amendment to the "combined scoping and assessment report - Environmental Impact Assessment report for the new NamPower powerline from Obib to Zincum Substation for Rosh Pinah Zinc Mine" ECC 01937 to include the Zincum Substation, the Aurus metering station.

To include the Zimcum Substation and Aurus Metering Station in the construction and operation. As well as the 400m powerline from Aurus to Zimcum.

Tuesday, 7 February 2023
Trinity Environmental Solutions 2023. 230116000799: Operations and management of the Torra Tented Camp and Camp Site in Kunene Region.

Renewal: Construction of a eco-friendly tourism tented camp.

Monday, 23 January 2023
Trinity Environmental Solutions 2023. 230106000759: Renewal Environmental Clearance Certificate for the Damaraland Basalt Lodge in Kunene Region.

ECC renewal for the construction of an eco-friendly lodge.

Thursday, 5 January 2023
Trinity Environmental Solutions 2023. 221220000720: Construction to gravel standard DR3662.

To allow for the upgrading of the 28km DR3662 to gravel standards. The road is already proclaimed.

Monday, 12 December 2022
A. Speiser Environmental Consultants 2022. 221126000475: Environmental Impact Assessment (Scoping Report and EIA and EMP) for the Environmental CLearance Certificate for the temporary water pipeline from the Rössing pipeline via Goanikontes to the Etango Mine site during construction.

Nature of Activity: Construction of a temporary water pipeline section from the Rössing pipeline via Farm Weizenberg to the Etango Project site. Location of Activity: The proposed pipeline will follow the route of the existing pipeline from the Rössing pipeline take off near the B2 national road to Farm Weizenberg, which currently supplies some of the farms (Weizenberg, Goanikontes) in the Swakop River with water.

Tuesday, 8 November 2022
Trinity Environmental Solutions 2022. 221024000163: Environmental Impact Assessment (EIA) for the proposed construction to gravel standard of DR3662 (Tsandi via Eendombe to Iipanda) and DR3682 (Otamanzi to Onaanda) in Omusati Region.

Gravel road construction of DR3682 from Onaanda to Otamanzi (Omusati Region). This road is already a proclaimed road, since the 1990s.

Thursday, 21 April 2022
A. Speiser Environmental Consultants 2022. APP-003686: Renewal application for the ECC for the Etango Linear Infrastructure, Erongo Region.

This is a renewal application for the existing ECC for Bannerman's Etango Linear Infrastructure. The ECC will expire on 19 June 2022. Please find attached the Form 1. No changes have been done to the project, as Bannerman has not started to develop the infrastructure for the Etango Mine.

Wednesday, 23 March 2022
A. Speiser Environmental Consultants 2022. APP-003058: Environmental Impact Assessment for Bannerman Mining Resources' proposed new water pipeline from the base pump station near Swakopmund to the Etango Project turn off from the C28 Road.

Construction of a water pipeline section from the base pump station near Swakopmund to the C28 T-turn off. The proposed pipeline will follow the existing Lange Heinrich and Swakop Uranium Mine water pipelines from the base pump station near Swakopmund to the C28 T-turn off. Water supply for the Project is assumed to come from NamWater in the form of desalinated water for the processing and domestic requirements. The same pipeline corridor that is used for the Langer Heinrich and Swakop Uranium Mines will be utilised, branching off from the C28 Road to the Etango Project site.

Thursday, 2 December 2021
Trinity Environmental Solutions 2021. APP-003231: Upgrading to bitumen standards: DR 3403 Divundu - Bagani - Mohebo Border Post in Kavango East Region.

Road upgrading from a gravel road to a tar road (bitumen standards) The proposed project is located in the Kavango East Region in Northern Namibia. It involves the upgrading to bitumen standard of the District Road 3403 stretching from Divundu via Bagani and ending at Mohembo Border Post in the Kavango East Region in Northern Namibia. The District Road 3403 starts at the junction with TR8/4 in Divundu and follows a south easterly direction for 8km to Bagani. From Bagani the road follows a southerly direction towards the Mohembo border post between Namibia and Botswana.

Friday, 19 November 2021
Trinity Environmental Solutions 2021. APP-003188: Construction to Gravel Standard DR3427.

The proposed road construction is a continuation of the DR3427 that starts in Tondoro Village along the B10 highway near Nkurenkuru. The initiation first phase construction was completed in 2015 from Tondoro to Mburu-Uru. This proposed construction aimed at completing the DR3427 construction from where the first phase ended in 2015. Thus the second phase seeks to complete the DR3427 from Mburu-Uru to Calikawo/Charlie Cutline/DR3446.

Sunday, 10 October 2021
A. Speiser Environmental Consultants 2021. APP-002977: Assessment report for the new Nampower Power Line from Obib to Zincum Substation for RPZC Mine.

Re: Renewal of Environmental Clearance Certificate (ECC) for the new Nampower Power Line from Obib to Zincum Substation for Rosh Pinah Mine. I refer to the formal renewal application of the ECC that was granted by your office on the 7th May 2014 (Valid for 3 years) The ECC was not renewed as the project was ceased at the time. As Rosh Pinah Mine is in the process to upgrade their operation the project will commence in the next months after the ECC has been obtained. The alignment of the powerline will be from OBIB to ZINCUM substation.

Thursday, 26 August 2021
A. Speiser Environmental Consultants 2021. APP-002851: New Nampower power line from Obib to Zincum Substation for RPZC mine .

The increase in production will require additional power supply provided by NamPower. NamPower has indicated that the existing 66 kV line would not be able to meet the mine’s power requirements. As all power demands in the area are currently growing, these loads (including to the Sendelingsdrif Mine) would have a negative effect on the security of power supply to RPZC. A New 66 kV line to be constructed from Obib to Zincum substation at Rosh Pinah with the specific purpose of supplying the mine with adequate power.

Thursday, 5 August 2021
A. Speiser Environmental Consultants 2021. APP-002847: Renewal application for the ECC for the Etango Project.

Dear Madam/Sir this is a renewal application for the existing ECC for Bannerman's Etango Project. The ECC will expire on 10 October 2021. Please find attached the Form 1. No changes have been done to the project, as Bannerman has not started to develop the mine.

Wednesday, 28 July 2021
A. Speiser Environmental Consultants 2021. APP-002452: Environmental Impact Assessment and Environmental Management Plan for the offshore mining activities on the proposed ML 220 of LK Mining, required for an Environmental Clearance Certificate.

LKM proposes to mine the delineated resource area, making use of a small dredge pump vessel with onboard processing facility. Ongoing sampling, resource development, and some detail geophysical survey will cover selected target areas. The same methods were used during the exploration activities over EPL 5965. The Mining Licence application was filed by LKM with MME in October 2019. The techniques required to prospect for and mine diamond resources varies according to the location of the area/operation, i.e. shallow water, mid water or deep-water areas.

Wednesday, 23 June 2021
A. Speiser Environmental Consultants 2021. APP-002717: Renewal application for ECC-EPL6762-0818 for EPL 6762.

This is a renewal application for the ECC-EPL6762-0818 for EPL 6762 hold by E-Tech Kalapuse Mining (Pty) Ltd. The ECC was granted on 03 August 2018.

Monday, 17 May 2021
A. Speiser Environmental Consultants 2021. APP-002546: Renewal of ECC for Minerals Deposit Retention Licence (MDRL) 3345.

Renewal of the existing Environmental Clearance Certificate (ECC) for MDRL 3345. The ECC will expire on 12 July 2021. Please let me know, how I can upload the bi-annual audit reports to support the ECC renewal application. This is not a new project, but the webpage started after the ECC was granted.

Friday, 20 November 2020
Trinity Environmental Solutions 2020. APP-002011: Renewal of an Environmental Clearance Certificate for the construction of Okongo 2.75 MW PV Plant obtained 10 April 2017.

Renewal of existing ECC obtained 10 April 2017 Construction of a 2.5 MW PV Plant in Okongo Village

Tuesday, 25 August 2020
A. Speiser Environmental Consultants 2020. APP-001718: renewal of Environmental Clearance Certificate (ECC) for EPL 3345.

Commenting of the public on this project will expire at 12h00 on the 2020-08-25.

Wednesday, 10 June 2020
A. Speiser Environmental Consultants 2020. APP-001440: Zinc and Lead Storage and Loading Facility at Luederitz Harbour, Karas Region.

Renewal of the existing ECC (02 August 2017) to continue with the operation at the Luedritz Port.

Wednesday, 29 April 2020
Trinity Environmental Solutions 2020. APP-001318: Elephant Ridge Camp.

ECC to be attached to the application for Leasehold.

Friday, 28 February 2020
A. Speiser Environmental Consultants 2020. APP-001109: Scoping Report and EMP for Gergarub Exploration and Mining (PTY) Ltd. Exporlation activities on MDRL 2616.

Not found what you are looking for? Amend your search...