These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Renewal of ECC 3058 Bannerman Mining Resources Namibia would like to apply for a renewal of the Environmental Clearance Certificate (ECC - 3058) for the Proposed New Water Pipeline in accordance with the Environmental Management Regulations.
Nature of Activity: Construction and operation (logistical management of importing and exporting materials, including sulphuric acid, an essential reagent in the mining industry's extraction of uranium (U3O8)) of the sulphuric acid storage and handling facility at Walvis Bay harbor (see Appendix A). Please refer to the background information document (BID) in Appendix B for further details. Location of Activity: Construction of a sulphuric acid storage and handling facilities at the Walvis Bay Port including transport from the WB Port to the Etango Mine (see Appendix A).
Amendment to the existing EIA and EMP for the Mining Licence 39 - change of mining method and processing plant at Rosh Pinah Zinc Corporation's Mine - RP2.0 expansion project.
Attachment | Size |
---|---|
2247_EMP_ ML 39.pdf | 3.59 MB |
2247_ECC Old_ ML 39.pdf | 212.05 KB |
2247_Map_ ML 39.pdf | 467.81 KB |
2247_Screening Notice_ ML 39.pdf | 284.34 KB |
ECC for RPZC storage and loading of zinc and lead at Lüderitz Harbor. Renewal of the ECC issued on 2020-07-19. Valid until 2023-07-19.
Continuation of: The small-scale extraction of semi-precious stones through controlled blasting and excavations. ML 135 is located in the Sarusus area within the Skeleton Coast Park, approximately 74 km north-west of Mowe Bay, north of the Khumib River, approximately 3 km inland from the coast. The mining license covers an area of ±1 560 ha.
Attachment | Size |
---|---|
1407_EMP_ML135 in Kunene Region.pdf | 165.68 KB |
1407_ECC Old_ML135 in Kunene Region.pdf | 294.84 KB |
1407_Map_ML135 in Kunene Region.pdf | 217.29 KB |
1407_Screening Notice_ML135 in Kunene Region.pdf | 50.21 KB |
To include the Zimcum Substation and Aurus Metering Station in the construction and operation. As well as the 400m powerline from Aurus to Zimcum.
Nature of Activity: Construction of a temporary water pipeline section from the Rössing pipeline via Farm Weizenberg to the Etango Project site. Location of Activity: The proposed pipeline will follow the route of the existing pipeline from the Rössing pipeline take off near the B2 national road to Farm Weizenberg, which currently supplies some of the farms (Weizenberg, Goanikontes) in the Swakop River with water.
This is a renewal application for the existing ECC for Bannerman's Etango Linear Infrastructure. The ECC will expire on 19 June 2022. Please find attached the Form 1. No changes have been done to the project, as Bannerman has not started to develop the infrastructure for the Etango Mine.
Construction of a water pipeline section from the base pump station near Swakopmund to the C28 T-turn off. The proposed pipeline will follow the existing Lange Heinrich and Swakop Uranium Mine water pipelines from the base pump station near Swakopmund to the C28 T-turn off. Water supply for the Project is assumed to come from NamWater in the form of desalinated water for the processing and domestic requirements. The same pipeline corridor that is used for the Langer Heinrich and Swakop Uranium Mines will be utilised, branching off from the C28 Road to the Etango Project site.
Geological exploration on EPL 6605. The EPL falls within the Erongo and Khomas Region.
Re: Renewal of Environmental Clearance Certificate (ECC) for the new Nampower Power Line from Obib to Zincum Substation for Rosh Pinah Mine. I refer to the formal renewal application of the ECC that was granted by your office on the 7th May 2014 (Valid for 3 years) The ECC was not renewed as the project was ceased at the time. As Rosh Pinah Mine is in the process to upgrade their operation the project will commence in the next months after the ECC has been obtained. The alignment of the powerline will be from OBIB to ZINCUM substation.
The increase in production will require additional power supply provided by NamPower. NamPower has indicated that the existing 66 kV line would not be able to meet the mine’s power requirements. As all power demands in the area are currently growing, these loads (including to the Sendelingsdrif Mine) would have a negative effect on the security of power supply to RPZC. A New 66 kV line to be constructed from Obib to Zincum substation at Rosh Pinah with the specific purpose of supplying the mine with adequate power.
Dear Madam/Sir this is a renewal application for the existing ECC for Bannerman's Etango Project. The ECC will expire on 10 October 2021. Please find attached the Form 1. No changes have been done to the project, as Bannerman has not started to develop the mine.
LKM proposes to mine the delineated resource area, making use of a small dredge pump vessel with onboard processing facility. Ongoing sampling, resource development, and some detail geophysical survey will cover selected target areas. The same methods were used during the exploration activities over EPL 5965. The Mining Licence application was filed by LKM with MME in October 2019. The techniques required to prospect for and mine diamond resources varies according to the location of the area/operation, i.e. shallow water, mid water or deep-water areas.
This is a renewal application for the ECC-EPL6762-0818 for EPL 6762 hold by E-Tech Kalapuse Mining (Pty) Ltd. The ECC was granted on 03 August 2018.
Renewal of the existing Environmental Clearance Certificate (ECC) for MDRL 3345. The ECC will expire on 12 July 2021. Please let me know, how I can upload the bi-annual audit reports to support the ECC renewal application. This is not a new project, but the webpage started after the ECC was granted.
G&H need the clearance for an accident that occurred in Karibib whilst transporting hazardous chemicals.
Commenting of the public on this project will expire at 12h00 on the 2020-08-25.
Renewal of the existing ECC (02 August 2017) to continue with the operation at the Luedritz Port.