These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Renewal of ECC 3058 Bannerman Mining Resources Namibia would like to apply for a renewal of the Environmental Clearance Certificate (ECC - 3058) for the Proposed New Water Pipeline in accordance with the Environmental Management Regulations.
Attachment | Size |
---|---|
5466_EMP_ML44_Bogenfels in Karas Region.pdf | 2.1 MB |
5466_Declaration of Authorship_ML44_Bogenfels in Karas Region.pdf | 226.81 KB |
5466_ECC Old_ML44_Bogenfels in Karas Region.pdf | 103.43 KB |
5466_Map_ML44_Bogenfels in Karas Region.pdf | 87.13 KB |
5466_Screening Notice_ML44_Bogenfels in Karas Region.pdf | 96.13 KB |
5466_CV_ML44_Bogenfels in Karas Region.pdf | 11.37 KB |
Attachment | Size |
---|---|
5467_EMP_ML128C in Karas Region.pdf | 1.26 MB |
5467_Declaration of Authorship_ML128C in Karas Region.pdf | 227.71 KB |
5467_ECC Old_ML128C in Karas Region.pdf | 106.64 KB |
5467_Map_ML128C in Karas Region.pdf | 87.13 KB |
5467_Screening Notice_ML128C in Karas Region.pdf | 96.13 KB |
5467_CV_ML128C in Karas Region.pdf | 11.37 KB |
Nature of Activity: Construction and operation (logistical management of importing and exporting materials, including sulphuric acid, an essential reagent in the mining industry's extraction of uranium (U3O8)) of the sulphuric acid storage and handling facility at Walvis Bay harbor (see Appendix A). Please refer to the background information document (BID) in Appendix B for further details. Location of Activity: Construction of a sulphuric acid storage and handling facilities at the Walvis Bay Port including transport from the WB Port to the Etango Mine (see Appendix A).
Renewal - Proposed upgrade and construction of a freeway between Windhoek and Rehoboth, Khomas Region, Section 1A: Windhoek to Auaspoort Interchange.
Attachment | Size |
---|---|
2472_EMP_Windhoek to Auaspoort Interchange.pdf | 88.72 KB |
2472_BID_Windhoek to Auaspoort Interchange.pdf | 505.56 KB |
2472_ECC Renewal_Windhoek to Auaspoort Interchange.pdf | 6.88 MB |
2472_Screening Notice_Windhoek to Auaspoort Interchange.pdf | 93.42 KB |
Renewal - Proposed upgrade and construction of a freeway between Windhoek and Rehoboth, Khomas Region, Sections 1B and 2: Auaspoort Interchange to 15km North of Rehoboth.
Renewal - Proposed upgrade and construction of a freeway between Windhoek and Rehoboth, Khomas Region, Section 3: Potential Rehoboth Eastern Bypass and rehabilitation of T104/T105 South of Eastern Bypass.
Amendment to the existing EIA and EMP for the Mining Licence 39 - change of mining method and processing plant at Rosh Pinah Zinc Corporation's Mine - RP2.0 expansion project.
Attachment | Size |
---|---|
2247_EMP_ ML 39.pdf | 3.59 MB |
2247_ECC Old_ ML 39.pdf | 212.05 KB |
2247_Map_ ML 39.pdf | 467.81 KB |
2247_Screening Notice_ ML 39.pdf | 284.34 KB |
Transfer of ECC: Construction, Operation and Maintenance of Wind Power Generation facility from Nampower Corporation PTY Ltd to CERIM LUDERITZ ENERGY PTY Ltd.
Renewal of existing ECC No: 01649.
Attachment | Size |
---|---|
2057_BID_Oshakati Premier Electric 10 MW Solar Park.pdf | 234.84 KB |
2057_ECC Old_Oshakati Premier Electric 10 MW Solar Park.pdf | 1010.55 KB |
2057_Map_Oshakati Premier Electric 10 MW Solar Park.pdf | 259.15 KB |
2057_Screening Notice_Oshakati Premier Electric 10 MW Solar Park.pdf | 182.66 KB |
Renewal of ECC No: 00299.
ECC for RPZC storage and loading of zinc and lead at Lüderitz Harbor. Renewal of the ECC issued on 2020-07-19. Valid until 2023-07-19.
Construction and operation of a new 11kV 5.4km transmission line to supply the Cleanergy Site on Farm 58, Walvis Bay, Erongo Region.
Continuation of: The small-scale extraction of semi-precious stones through controlled blasting and excavations. ML 135 is located in the Sarusus area within the Skeleton Coast Park, approximately 74 km north-west of Mowe Bay, north of the Khumib River, approximately 3 km inland from the coast. The mining license covers an area of ±1 560 ha.
Attachment | Size |
---|---|
1407_EMP_ML135 in Kunene Region.pdf | 165.68 KB |
1407_ECC Old_ML135 in Kunene Region.pdf | 294.84 KB |
1407_Map_ML135 in Kunene Region.pdf | 217.29 KB |
1407_Screening Notice_ML135 in Kunene Region.pdf | 50.21 KB |
Renaming of EPL5028 to EPL7988 B - Transfer to new owner - from Epangelo Mining Company to Horn Metals Pty. Start invasive activity with limited target area drilling only (12 holes). Renewal of Environmental Clearance Certificate.
Renewal 02 - SunEQ Four Investments (Namibia) Pty (Ltd) 10 MV solar PV power plant at Ohorongo Cement.
ECC renewal township establishment on Erf 287, Otjimbingwe to be known as Otjimbingwe Extension 1.
ECC renewal existing feedmill and proposed storage warehouse on the Farm Otjihareva NO 62, Otjozodjupa Region.
A) Renewal of existing Environmental Clearance. B) Addition of 12 tented rooms to bring beds to 28 from the original 20. This application for amendment has already been submitted on 31 August 2022. This electronic submission is upon request by DEA staff member Damion Nchindo.
Attachment | Size |
---|---|
690_EMP_Twyfelfontein Adventure Camp Kunene Region.pdf | 1022.55 KB |
690_ECC Old_Twyfelfontein Adventure Camp Kunene Region.pdf | 258.18 KB |
690_Map_Twyfelfontein Adventure Camp Kunene Region.pdf | 166.59 KB |
690_Screening Notice_Twyfelfontein Adventure Camp Kunene Region.pdf | 191.02 KB |
To include the Zimcum Substation and Aurus Metering Station in the construction and operation. As well as the 400m powerline from Aurus to Zimcum.
ECC renewal application for Karingarab area in ML 43 and EPL 3749 for NAMDEB.
Nature of Activity: Construction of a temporary water pipeline section from the Rössing pipeline via Farm Weizenberg to the Etango Project site. Location of Activity: The proposed pipeline will follow the route of the existing pipeline from the Rössing pipeline take off near the B2 national road to Farm Weizenberg, which currently supplies some of the farms (Weizenberg, Goanikontes) in the Swakop River with water.
Renewal of ECC Abattoir, meat processing, canning. See project description in attached Scoping Report.
The listed activities applied for are (according to Section 1 of the Schedule of Listed Activities: The Construction and Operation of a 50MW Solar PV Plant, and 500m 33kV power line.
Renewal of ECC - proposed Diaz Wind Park, please consult with Mrs Saima Angula.
100MW Wind Power Park 100MW Solar Power Park Transmission Line with newly built substation.
This is a renewal application for the existing ECC for Bannerman's Etango Linear Infrastructure. The ECC will expire on 19 June 2022. Please find attached the Form 1. No changes have been done to the project, as Bannerman has not started to develop the infrastructure for the Etango Mine.
Tented camp in the Big Five Concession.
Renewal of the Environmental Clearance Certificate for the Environmental Procedure Review of Namibia Diamond Trading Company hazardous materials life cycle.
Exploration, sampling and mining of diamonds, including the associated services on ML42.
Construction of a water pipeline section from the base pump station near Swakopmund to the C28 T-turn off. The proposed pipeline will follow the existing Lange Heinrich and Swakop Uranium Mine water pipelines from the base pump station near Swakopmund to the C28 T-turn off. Water supply for the Project is assumed to come from NamWater in the form of desalinated water for the processing and domestic requirements. The same pipeline corridor that is used for the Langer Heinrich and Swakop Uranium Mines will be utilised, branching off from the C28 Road to the Etango Project site.
ML44 contains diamond deflation deposits as well as pocket beach marine deposits. Although not high priority targets at this stage the long term strategy is to develop these diamond deposits further. Exploration on the pocket beaches will be conducted using drilling and sampling as well as probe drilling. The large diameter drilling operation will consist of a drill, a drilling additive mixing plant, a front end loader, a dump truck and a crane truck. Activities will also include marine based exploration and mining.
Attachment | Size |
---|---|
3560_EMP_ECC renewal application for ML44_2022.pdf | 3.85 MB |
3560_ECC_ECC renewal application for ML44.pdf | 393.14 KB |
Namdeb holds four mining licenses, of which ML128C is the only totally sea-based license. Exploration in the marine license areas previously involved the collection of large-scale multibeam bathymetry and seismic data, followed by a regional geological drilling and sampling campaign, which opened up several new areas in the mid-water region. This was followed by sampling and test mining, the latter which will continue for the ensuing period:2022-2025.
Geological exploration on EPL 6605. The EPL falls within the Erongo and Khomas Region.
Re: Renewal of Environmental Clearance Certificate (ECC) for the new Nampower Power Line from Obib to Zincum Substation for Rosh Pinah Mine. I refer to the formal renewal application of the ECC that was granted by your office on the 7th May 2014 (Valid for 3 years) The ECC was not renewed as the project was ceased at the time. As Rosh Pinah Mine is in the process to upgrade their operation the project will commence in the next months after the ECC has been obtained. The alignment of the powerline will be from OBIB to ZINCUM substation.
To reflect change of ownership of the existing Environmental Clearance.
Attachment | Size |
---|---|
2973_EMP_Xaris Walvis Bay Power Plant.pdf | 778.3 KB |
2973_ECC_Xaris Walvis Bay Power Plant 2021.pdf | 2.38 MB |
2973_BID_Xaris Walvis Bay Power Plant 2021.pdf | 165.78 KB |
To reflect change of ownership of the existing Environmental Clearance.
Attachment | Size |
---|---|
2972_BID_Xaris Power Plant and Gas Supply Facility.pdf | 165.78 KB |
2972_Proof of Payment_Xaris Power Plant and Gas Supply Facility.pdf | 1.16 MB |
2972_ECC_Xaris Power Plant and Gas Supply Facility.pdf | 2.38 MB |