The records can be filtered using the search boxes. Or leave this page and do a full search of all records.
Attachment | Size |
---|---|
Engineering Inception Report_Technical Portion.pdf | 1.27 MB |
Attachment | Size |
---|---|
2014_07_25_PART I_CAN_Interim Report No_1.pdf | 17.12 MB |
Attachment | Size |
---|---|
2014_07_25_PART II_Cuvelai_Interim Report No_1.pdf | 15.15 MB |
Attachment | Size |
---|---|
2014_11_27_Stats and Yield final report Nov 2014.pdf | 1.4 MB |
Attachment | Size |
---|---|
CAN and Cuvelai Presentation_Windhoek.pdf | 3.88 MB |
Attachment | Size |
---|---|
Public Consultations on Water Aug Nam_phase1_July 2015.pdf | 253.22 KB |
Attachment | Size |
---|---|
Strategic Environmental Assessment_phase 1 Water Aug Nam_July 2015_.pdf | 525.87 KB |
Attachment | Size |
---|---|
Public Consultations Report_Phase 1 August 2015_Nam Water Augmentation_draft 2015_09_02.pdf | 2 MB |
Attachment | Size |
---|---|
2015_09_16_Project Update for MAWF.pdf | 2.3 MB |
Attachment | Size |
---|---|
2015_09_29_Project Memo on Phases 2 and 3.pdf | 2.33 MB |
Attachment | Size |
---|---|
Groundwater flow in the southern part of the Etosha basin indicated by the chemical composition of water.pdf | 872.51 KB |