Title:

230406001278: (Old ECC No. APP-002339) Application for renewal of Environmental Clearance Certificate (ECC) for ongoing exploration / prospecting for base and rare metals and precious metals in the EPL No. 5678, Omaruru District, Erongo Region

Publication Year:
2023
Abstract:

The Proponent requires a new Environmental Clearance Certificate (ECC) for ongoing Exploration / Prospecting for base and rare metals and precious metals in the EPL No. 5678 covering the following exploration stages: 1. Initial desktop exploration activities (review of existing information and all previous activities in order identify any potential target/s); 2. Regional reconnaissance field-based activities such mapping and sampling to identify areas with potential targets based on the recommendations of the desktop work; 3. Initial local field-based activities such as widely spaced mapping, sampling, surveying and possible drilling to determine the viability of any delineated local target; 4. Detailed local field-based activities such very detailed mapping, sampling, surveying and possible drilling to determine the feasibility of any delineated local target; 5. Prefeasibility and feasibility studies to be implemented on a site specific area if the local field-based studies proves positive followed by test mining. The extent of the field-based support and logistical activities will be dependent on the scale of proposed exploration activities to be undertaken. The proposed exploration activities will be supported by existing tracks and campsites / farmstead as well as existing accommodation in the local area as may be applicable. In the absences of existing tracks, the field team will create such new tracks with the permission of the land owner/s and depending on the scale of exploration. In the absences of existing suitable campsite / farmstead, a temporary camp site will be setup at suitable locations in line with the EMP provisions within the EPL area.

Item Type:
Report
Language:
en
Last date for commenting on this EIA: Monday, 29 May 2023

This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.