Title:
240227002884: The poposed installation of fve (5) underground power transmission cables for the "/Hao" Waveroller Pilot Project
Publication Year:
2024
Abstract:
Kaoko intends to apply for an Environmental Clearance Certificate (ECC) for its proposed installation of 5 Power Transmission Cables to transmit electricity from offshore where WaveRollers are proposed to be deployed, to the NamPower grid located onshore. The proposed development is located north of Wlotzkasbaken settlement, Erongo Region, Namibia. The proposed power cables will cover a linear distance of approximately 300 - 500 m offshore to the coastline and installed on the seabed. It will further cover an approximately 1.7 km of underground installation from the shoreline to the Nampower substation located onshore.
Item Type:
Report
Language:
en
Last date for commenting on this EIA: Tuesday, 2 April 2024

This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.