Title:

230330001236: Application for Environmental Clearance Certificate for the construction and operation of the 132kV transmission line from Masivi Substation to Shiyambi Substation 33kV Transmission line from Shiyambi Substation to Cuito Substation related infrastructure

Author(s):
Publication Year:
2023
Abstract:

The Environmental Clearance Certificate (ECC) is for the construction and operation of the 132kV transmission line from Masivi Substation to Shiyambi Substation 33kV Transmission line from Shiyambi Substation to Cuito Substation related infrastructure. In addition infrastructures covered under the ECC include a 800m line 132kV Transmission line connecting Masivi substation to the existing 132kV Otjikoto- Rundu transmission line and a 1.5km , 66kV transmission line connecting Shiyambi Substation and Mahango 66kV Transmission line.

Item Type:
Report
Language:
en
Last date for commenting on this EIA: Sunday, 4 June 2023

This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.