APP-003318: Powerline of TeraSun Energy (Pty) Ltd near Arandis
Construction of a 132 kV interconnection overhead powerline from the PV power plant of TeraSun Energy to the Lithops Substation of NamPower near Arandis.
This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.