Title:

APP-003206: Application for the renewal of an Environmental Clearance Certificate for the construction and operation of the Hardap Photovoltaic Power Facility, Mariental District, Hardap Region

Author(s):
Publication Year:
2021
Abstract:

The Renewal of the Environmental Clearance Certificate is for: o Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power) o Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power) o Activity 5.1(c) - Land Use and Development Activities Agricultural use to industrial use 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1. Title of Activity The construction and operation of the Hardap Photovoltaic Power Facility. 2.2. Location of Activity The photovoltaic (PV) solar power facility is situated on Portion 126 of the Farm Koichas No. 89, adjacent to the existing Hardap Substation, located approximately 4.5km east of the town of Mariental, situated in the Hardap Region. 2.3 Nature of Activity The activities undertaken by the PV solar power facility are for power generation, which comprises of the following components: Direct conversion of the sun`s rays into electricity via photovoltaic technology; Electricity management infrastructure and systems; Direct employment and appointment of contractors; and Supporting infrastructure and services. 2.4 Scale and Scope of the Activity The Project consists of an existing 10 MegaWatt (MW) Photovoltaic Solar Power Facility hereafter referred to as the Hardap Photovoltaic Project (HPVP). The PV Plant consists of  PV panels mounted on either a fixed or tracking substructure for anchorage which are driven / rammed into the ground. The PV panels are grouped in a ‘table’ consisting of up to 20 or more panels depending on the substructure selected. The electricity generated by the PV arrangement is fed into the existing electricity supply network via the existing Hardap Substation located adjacent the PV solar project. The operations of the PV solar power facility have been operational since December 2018.

Item Type:
Report
Language:
en
Last date for commenting on this EIA: Wednesday, 22 December 2021

EIS custom tag descriptions

This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.