APP-003188: Construction to Gravel Standard DR3427
The proposed road construction is a continuation of the DR3427 that starts in Tondoro Village along the B10 highway near Nkurenkuru. The initiation first phase construction was completed in 2015 from Tondoro to Mburu-Uru. This proposed construction aimed at completing the DR3427 construction from where the first phase ended in 2015. Thus the second phase seeks to complete the DR3427 from Mburu-Uru to Calikawo/Charlie Cutline/DR3446.
Attachment | Size |
---|---|
3188_EIASR_Construction to Gravel Standard DR3427.pdf | 1.45 MB |
3188_EMP_Construction to Gravel Standard DR3427.pdf | 1.52 MB |
3188_Map_Construction to Gravel Standard DR3427.pdf | 577.67 KB |
This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.