APP-002577: Upgrade of oil industry firefighting pump line and pump station in Walvis Bay, Erongo Region
Request on whether an ECC is required for the following project : Replace the existing seawater firewater supply pipeline from the seawater intake pump station (at Etosha) to the Oil Industry Terminals. The existing pipeline runs underground in a servitude from the Pump station to the Terminals. This pipeline will be removed and replace with a new pipeline in the same trench and servitude. The pump station will also be demolished and replaced with a new building and equipment (same size building and at the same position). Refer to attached background information document.
This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.