Title:

APP-00197: Operations of the Firm Power Project Anixas II Power Station in Walvis bay, Erongo Region

Publication Year:
2020
Abstract:

NamPower would like to inquire whether the proposed project will require a full EIA or an amendment to the existing Anixas Power Station Environmental Clearance Certificate will be sufficient. The Firm Power project is proposed to be located next to Anixas Power Station in Walvis bay . The proposed generation capacity will be 50 MW. It is envisioned that the Firm Power Station and Anixas Power Station, each will be operated independently. Anixas Power Station has an existing Environmental Clearance Certificate. The land to accommodate the envisioned development is owned by NamPower and is enclosed with boundary walls in the Walvis bay Industrial area where Anixas is located. Find attached background for illustration of the site.

Item Type:
Report
Language:
en
Last date for commenting on this EIA: Wednesday, 30 December 2020

This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.