These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. The proposed prospecting and exploration activities of base and rare metals, dimension stone, industrial minerals and precious metals on Exclusive Prospecting Licence (EPL) No. 9108 located south east of Grootspitskop in the Erongo Region.
| Attachment | Size |
|---|---|
| BID_Subdivision of Farm 58_Walvis Bay.pdf | 768.15 KB |
| Attachment | Size |
|---|---|
| BID_EPL No 10602 located near Helmeringhausen.pdf | 1004.86 KB |
| Attachment | Size |
|---|---|
| BID_Construction activities_Portion 5 of Farm 38_Walvis Bay.pdf | 378.48 KB |
Documents cannot be downloaded from EIA-MET Site – for public view only, not for distribution. Only BID Available.
| Attachment | Size |
|---|---|
| BID_Street Creation on Erf 17_and the Remainder of Consolidated Erf X_Tsumeb Extension 13.pdf | 1.11 MB |
| Attachment | Size |
|---|---|
| BID_Krone Elephant Lodge_DoroNawas Conservancy.pdf | 457.54 KB |
| EASR_Krone Elephant Lodge_DoroNawas Conservancy.pdf | 4.83 MB |
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Rhino Resources Namibia Ltd (Rhino) is proposing to undertake 3D seismic surveying activities across PEL0085/Block 2914A as part of their exploration campaign. Marine seismic surveys are an essential part of hydrocarbon exploration, as they provide information on the depth, position and geometry of subsurface geological formations. The activity may be undertaken using either conventional towed streamer technology and/or Ocean Bottom Node (OBN) technology.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. This serves as a 'Renewal of the Environment Clearance Certificate' for the Proposed Rockey Crest Extension 4-9 Township Development Project, Windhoek. - The initial ECC was issued on 23 August 2023 and expired on 23 August 2016. - The renewed ECC serial with serial number 7wRTDs1768 was issued on 30 November 2021 expired on 30 November 2024. There are no changes that took place to these extensions.
Documents cannot be downloaded from EIA-MET Site – for public view only, not for distribution. Only BID available. The Helao Nafidi Town Council hereinafter referred to as the proponent intends to undertake the following activities: Subdivision of the Remainder of the Farm Helao Nafidi Town and Townlands No. 997 into Portion A and Remainder; Layout approval and Township Establishment on Portion A of the Farm Helao Nafidi Town and Townlands No. 997 to become known as Olunghono Proper.
| Attachment | Size |
|---|---|
| BID_Portion A of the Farm Helao Nafidi Town and Townlands No 997_Olunghono Proper.pdf | 755.91 KB |
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Only BID available. The Helao Nafidi Town Council hereinafter referred to as the proponent intends to undertake the following activities: Layout approval and Township Establishment on Erf 80, Oshikango Proper (Location 17) to become known as Oshikango, Extension 4.
| Attachment | Size |
|---|---|
| BID_Township Establishment on Erf 80_Oshikango Proper_to become known as Oshikango Extension 4.pdf | 684.65 KB |
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Only Executive Summary available. Mr. Petrus Katumbo Ipangelwa hereinafter referred to as the proponent intends to undertake the following activities: Rezoning of Erf 954, Rundu Extension 3 from "Residential" to "Business" with a bulk of 0.75. The above development triggers listed activities in terms of the Environmental Management Act (No. 7 of 2007) and Environmental Impact Assessment Regulations (Government Notice No. 30 of 2012).
| Attachment | Size |
|---|---|
| Executive Summary_Rezoning of Erf 954_Rundu Extension 3.pdf | 198.64 KB |
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. The objective is to obtain an Environmental Clearance Certificate (ECC) for the Proposed Township Establishment and Layout approval on the Remaining extent of Portion 13 of the farm Emmarentia No. 380, located on Portion 13 of the farm Emmarentia No. 380 is located about 20 km north of Windhoek, Khomas Region, Namibia.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Renewal of Environmental Clearance Certificate for the Environmental Plan for township development and upgrading informal settlement, mix settlement, Khomas Region. The ECC expired on 03 February 2017.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. The ECC is required to authorise the construction of the proposed New Nkurenkuru District Hospital in Nkurenkuru, Kavango West Region. The project entails the development of a large-scale public health facility on approximately 40 hectares of previously undeveloped (virgin) land donated by the Nkurenkuru Town Council to the Ministry of Health and Social Services.
Not yet on EIA-MEFT Site. Excel Dynamic Solutions (Pty) Ltd (The Consultant) was appointed by Afron Exploration Namibia (Pty) Ltd (The Proponent) to act on their behalf in obtaining the Environmental Clearence Certificate (ECC) for prospecting and exploration activities on Exclusive Prospecting License (EPL) No.10671. The 35 804 hectares EPL is located about 20 km west of Seis in Khomas Region, Namibia (see figure 1). The EPL (center coordinates; - 22.39150, 17.40439) (see figure 2).
| Attachment | Size |
|---|---|
| BID_EPL No 10671 located west of Seeis in the Khomas Region.pdf | 305.99 KB |
Not yet on EIA-MET Site. Only BID available. Excel Dynamic Solutions (Pty) Ltd (The Consultant) was appointed by Annelize Weber (The Proponent) to act on their behalf in obtaining the Environmental Clearance Certificate (ECC) for the proposed small-scale mining activities on Mining Claims (MCs) No. 74269 - 74272. These MCs have a combined area size of 71.51 hectares and are located about 24 km north- east of Uis in the Daures constituency, Erongo region (see figure 1). The MCs (center coordinates; - 21.0762776, 15.0479695) overlies the Otjimboyo communal conservancy (see figure 2).
| Attachment | Size |
|---|---|
| BID_MCs No 74269_74270_74271 and 74272 located northeast of Uis.pdf | 661.63 KB |
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Exploration activities for base and rare metals, dimension stones, industrial minerals, non-nuclear fuel minerals, nuclear fuel minerals, precious metals and precious stones on EPL 11147, 11151 and 11472 in Hardap and Karas Region.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. The ECC is being applied for the Proposed Rezoning, Subdivision, Servitude Expansion and Associated Infrastructure Development on Farm 29/H/48 Brakwater, Khomas Region, Namibia. The application covers the rezoning of the property from Residential (1:50 000 density) to Restricted Business, together with the subdivision required for planning and road-reserve purposes.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Construction and operation of an abattoir on Farm 506 Keetmanshoop Town and Townlands No.150, Karas Region.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Application for Environmental Clearance Certificate for Environmental Impact Assessment for the establishment of exploration activities of base and rare metals, industrial minerals and precious metals on the Exclusive Prospecting License (EPL) 9591, Karasburg District, Karas Region, Namibia.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Only Meeting Invitation available. Haib Minerals (Pty) Ltd, a Namibian subsidiary of Koryx Copper Inc., is undertaking an Environmental Impact Assessment (EIA) for the proposed Haib Copper Mine located near Noordoewer in the //Kharas Region. In parallel, an EIA is being undertaken for the associated Haib Copper Water Abstraction, Supply and Storage infrastructure to support the mines water demand, to be implemented by NamWater.
| Attachment | Size |
|---|---|
| Meeting Invitation_Proposed Haib Copper Project_near Noordoewer.pdf | 216.44 KB |
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Only BID and Executive Summary available. Activity 5.1 (d) Land Use and Development Activities - The rezoning of land from use for nature conservation or zoned open space to any other land use Activity 10.1 (b) Infrastructure- The construction of Public road; Activity 10.2 (a) Infrastructure- The route determination of roads and design of associated physical infrastructure where - it is a public road.
| Attachment | Size |
|---|---|
| BID_Subdivision of Erf 8125_Rundu Extension 26.pdf | 829.16 KB |
| Executive Summary_Subdivision of Erf 8125_Rundu Extension 26.pdf | 130.26 KB |
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Only BID available. SleepOver Hotels Namibia (Pty) Ltd, hereinafter referred to as the proponent intends to undertake the following activities: Rezoning Farm 521 of the Remainder of Portion 45 of the Remainder of Farm Keetmanshoop Town and Townlands No. 150 from "Light Industrial" to "Hospitality". The above development triggers listed activities in terms of the Environmental Management Act (No. 7 of 2007) and Environmental Impact Assessment Regulations (Government Notice No. 30 of 2012).
| Attachment | Size |
|---|---|
| BID_Rezoning of Farm 521 Keetmanshoop No 150_to Hospitality.pdf | 635.82 KB |
| Draft DESR_Rezoning of Farm 521 Keetmanshoop No 150_to Hospitality.pdf | 5.5 MB |
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. The regularisation of an existing tented camp and campsite.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution.
The proposed project involves the construction of a telecommunication Base Transceiver Station (BTS) tower at Onhuno Roadblock as part of PowerCom (Pty) Ltd’s initiative to improve network coverage and communication infrastructure in Namibia. The proposed development aims to enhance telecommunication connectivity, reduce network congestion, and support socio-economic development within the surrounding communities. In line with the requirements of the Environmental Management Act (No.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. The purpose of the ECC application is to obtain environmental authorization for the proposed rezoning of Farm 29/H/48 Brakwater from Residential (1:50 000) to Restricted Business, together with the associated subdivision, access reconfiguration, expansion of the Right of Way servitude, junction development, and supporting infrastructure.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Only BID available. Green Earth Environmental Consultants have been appointed by Hochland 7191 (Pty) Ltd, the Proponent, to attend to and complete an Environmental Impact Assessment and Environmental Management Plan (EMP) to obtain an Environmental Clearance Certificate as per the requirements of the Environmental Management Act (No.
| Attachment | Size |
|---|---|
| BID_Closure of portion a of the Remainder of Erf 294_Otjiwarongo.pdf | 1.05 MB |
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Only BID available. Seeis Farming Number Twenty CC hereinafter referred to as the proponent intends to undertake the following activities: Subdivision of the Remainder of Portion 20 (a Portion of Portion 16) of the Farm Seeis No. 134 into 27 Portions and the Remainder; and Reservation of the Remainder of Portion 20 (a Portion of Portion 16) of the Farm Seeis No. 134 as "Street".
| Attachment | Size |
|---|---|
| BID_Subdivision and street creation_Remainder of Portion 20_Farm Seeis No 134.pdf | 794.08 KB |
Documents cannot be downloaded from EIA-MET Site – for public view only, not for distribution. Only BID available. An Environmental Impact Assessment (EIA) process has commenced to assist in determining the extent and significance of the environmental consequences associated with the proposed Rezoning of Erf 802, Oshakati Extension 2 from "Single Residential" with a density of 1:900 to "Business" with a bulk factor of 1.0.
| Attachment | Size |
|---|---|
| BID_Rezoning of Erf 802_Oshakati Extension 2.pdf | 567.71 KB |
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Continued operation of the existing Aqua Services and Engineering Facilities including storage and handling of various Industrial Chemicals at Erf 113, 11th Street Walvis Bay and Transportation in Namibia.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Mrs. Ester Shapwanale (hereinafter referred to as the Proponent), is the sole holder of Exclusive Prospecting License (EPL) 8128 (the EPL) in Otjozondjupa and Khomas Regions, and intends to undertake exploration and prospecting of Base and Rare Metals, Precious Metals, Dimension Stones and Industrial Minerals. The proponent was issued with an approved Environmental Clearance Certificate in 2022, the current ECC has since expired.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. The site was constructed by Namibia Development Corporation (NDC) in 2016, on a piece of land belonging to the state-owned enterprise. Construction of the facility could however not be completed at the time due to prolonged legal matters. Since then, VIVO Energy Namibia Ltd (the proponent) has taken over the site, and the project is now nearing completion, with only minor renovations remaining.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Arandis is served by an existing disposal site located approximately 2 kilometres from the town centre. Although operational for many years, the disposal site lacks an Environmental Clearance Certificate (ECC) and an approved Environmental Management Plan (EMP). Additionally, the existing dumpsite lacks a dedicated erf, and its current access road remains unformalized and unregistered.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Ministry of Education, Innovation, Youth, Sport, Arts and Culture (MEIYSAC) intends on obtaining an Environmental Clearance Certificate (ECC) for upearthing of the embankment on the Mpunkano Combined School Platform, in order to allow learners and their parents to relocate to such a higher ground during flood times as a permanent solution to the flooding problem.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. For clearance to harvest timber on Farm 1489, for: -raising financial resources to enable mitigation of social and economic hardships resulting from global mishappenings, especially current energy crisis. -Raising financial resources to mitigate current human and wildlife conflict, especially by elephants that break down fences and eat up crops. Currently the Proponent has to keep a team of guards on lookout around the farm for break-ins.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. The Roads Authority intends to obtain an Environmental Clearance Certificate (ECC) for the Upgrading of the Existing Uushake to Okankolo District Road (DR) 3062 to Bitumen Standard in Ohangwena Region, Namibia. The 57.9-kilometre road will be upgraded to a low-volume seal standard, with phase one covering five kilometres over a period of eight months.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. To carry out comprehensive exploration activities for high grade dimension stone (white marble) at EPL 7950. The exploration program will include identifying high quality marble deposit using remote sensing technology and mapping out the extent of the deposit and evaluate chemical analysis through core drilling and test block cuttings to access commercial viability.
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. The Environmental Clearance Certificate (ECC) application is for the project titled: Environmental Impact Assessment for the Green Hydrogen, Green Ammonia and Associated Infrastructure at Arandis Townlands, Erongo Region, Namibia. Purpose and Scope of the ECC: The ECC is being sought to authorize the development of core industrial components within a 131.25-hectare (1,312,500 m2 ) slot of the larger 525-hectare Net Zero Industrial Park.
Documents cannot be downloaded from EIA-MET Site – for public view only, not for distribution. Only BID is available. Geo Pollution Technologies (Pty) Ltd was appointed by CJJ van der Merwe (the Proponent) to undertake an environmental assessment for irrigation activities on the farm Lente, being Portion 5 of Farm Ludwigshafen No. 480, in the Oshikoto Region (Figure 1-1). Currently the Proponent irrigates a combined area of 63 ha from production boreholes on the farm. Pending the outcome of an environmental assessment, the total water abstraction per year, may be increased.
| Attachment | Size |
|---|---|
| BID_Irrigation based agriculture activities on Farm Lente_Oshikoto Region.pdf | 362.13 KB |
Documents cannot be downloaded from EIA-MET Site - for public view only, not for distribution. Only BID available. Geo Pollution Technologies (Pty) Ltd was appointed by Haakiesdoorn Estate (Pty) Ltd to undertake an environmental assessment for their operations of irrigation based agricultural activities on Remainder of the Farm Haakiesdoorn No.137 near Noordoewer (Figure 1-1), //Kharas Region. The operations refers to the cultivation and harvesting of mainly medjool dates and mangos.
| Attachment | Size |
|---|---|
| BID_Irrigation_based agricultural operations of Haakiesdoorn Estate_Karas Region.pdf | 455.45 KB |