Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 50 of 244
Monday, 6 October 2025
NamPower 2025. 250904006363: The application for the renewal of the Environmental Clearance Certificate for the operation and maintenance of existing 220kv Walmund - Kuiseb and 132 Kuiseb - Walvis Bay 1 and 2 transmission lines including Kuiseb and Walmund substations and other associaciated infrastructure in Erongo Region.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2022, NamPower obtained an Environmental Clearance Certificate (ECC) for the operation and maintenance of operation and maintenance of existing 220kv Walmund - Kuiseb and 132 Kuiseb - Walvis Bay 1 and 2 Transmission lines Including Kuiseb and Walmund Substations and other associated infrastructures in Erongo Region.

Monday, 6 October 2025
NamPower 2025. 250912006400: The application for the renewal of the Environmental Clearance Certificate for the operation and maintenance of an existing Gerus transmission station and associated infrastructures in Otjozondjupa Region.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2022 NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the Gerus Transmission Station. NamPower would therefore like to apply for the renewal of the ECC for the Gerus Transmission Station to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250829006319: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing van Eck - Matchless 1 electrical reticulation system including Khomaskop substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Van Eck - Matchless 1 electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250819006271: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Oamites - Oamites Military Base electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for operation and maintenance of the Oamites - Oamites Military Base and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250829006321: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Witvlei - Witvlei Farmers electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance Witvlei – Witvlei Farmers Reticulation and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250820006280: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Oanob - Oanob dam electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for operation and maintenance of the Oanob - Oanob Dam electrical reticulation system and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250829006323: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Seeis - Seeis North electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Seeis - Seeis North and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250820006282: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Ombotozu - Ombotozu electrical reticulation system including ombotozu substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Ombotozu - Ombotozu electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250829006324: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing von Bach Base - Osona electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the Von Bach Base - Osona reticulation and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250820006284: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Ongeama - Ongeama electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for operation and maintenance of Ongeama - Ongeama electrical reticulation system and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250819006268: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing de Hoek - Talismanus electrical reticulation system including de Hoek Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of De Hoek - Talismanus electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250829006325: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing von Bach Booster 2 - Nubuamis and von Bach Booster 2 - dwa electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Von Bach Booster 2 - Nubuamis electrical reticulation system and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250820006285: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Osona - Tower, Swakoppoort - Gros Barmen and Swakoppoort - Swakoppoort bst electrical reticulation system and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Osona - Tower electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250819006269: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Detmond - Kutako electrical reticulation system including Detmond Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Detmond – Kutako electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250829006326: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing von Bach Booster 1 - Otjihavera electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the Von Bach Booster 1 - Otjihavera reticulation and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250820006291: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Otjivero - Otjivero electrical reticulation system and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Otjivero – Otjivero and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 18 September 2025
NamPower 2025. 250819006270: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Leutwein - Omeya electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Leutwein - Omeya and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Wednesday, 17 September 2025
NamPower 2025. 250819006267: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Blumfelde - Tsumis electrical reticulation system and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as “energy distribution, transmission and generation” requires an Environmental Clearance Certificate (ECC) as it is a listed activity.

Tuesday, 19 August 2025
NamPower 2025. 250725006170: The proposed Nampower Wind and Solar Park near Rosh Pinah in //Karas Region.
Renewal of ECC for the Proposed Wind and Solar Park near Roshpinah in //Karas Region.
Tuesday, 19 August 2025
NamPower 2025. 250725006172: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Hoffnung - Kapps Farm and Hoffnung - Hoffnung electrical reticulation system including NBC indoor substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Hoffnung - Kapps and Hoffnung - Hoffnung Farm Reticulation System Including NBC Indoor Substation and other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 15 August 2025
NamPower 2025. 250717006146: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Blumfelde - Hoachanas electrical reticulation system including Hoachanas, Duineveld and Kalkrand Substations and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Blumfelde - Hoachanas electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 15 August 2025
NamPower 2025. 250717006136: The application for the Environmental Clearance for the operation and maintenance of an existing Aris - Aris electrical reticulation system including Aris Substation and other associated infrastructure.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the Aris - Aris electrical reticulation system and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 15 August 2025
NamPower 2025. 250717006142: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Omaere - Dorsland electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Omaere - Dorsland and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 15 August 2025
NamPower 2025. 250717006143: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Omaheke - Drimiopsis electrical reticulation system including Epukiro Substation and Pos 3 Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Omaheke - Drimiopsis electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 15 August 2025
NamPower 2025. 250717006144: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Seeis - Dordabis electrical reticulation system and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Seeis - Dordabis and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 11 August 2025
NamPower 2025. 250717006138: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Gobabis - Gobabis electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Gobabis – Gobabis and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 11 August 2025
NamPower 2025. 250717006139: The application for the for the Environmental Clearance Certificate for the operation and maintenance of an existing von Bach Booster 2 - Döbra and von Bach Booster 2 - Brakwater electrical reticulation system including other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Von Bach Booster 2 - Döbra and Von Bach Booster 2 - Brakwater Reticulation System including other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 11 August 2025
NamPower 2025. 250717006140: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Groot Aub - Groot Aub electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Groot Aub - Groot Aub and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 11 August 2025
NamPower 2025. 250717006141: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Omaere - Buitepos and Omaere - Kroonster electrical reticulation system including other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Omaere - Buitepos and Omaere - Kroonster Reticulation System including other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 11 August 2025
NamPower 2025. 250717006147: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Hochfeld - Hochfeld 1 electrical reticulation system including Hochfeld Substation and Otjinene Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Hochfeld – Hochfeld 1 electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 11 August 2025
NamPower 2025. 250717006148: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Hochfeld - Hochfeld 1 electrical reticulation system including Hochfeld Substation and Otjinene Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Hoffnung - Kapps and Hoffnung - Hoffnung Farm Reticulation System Including NBC Indoor Substation and other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 4 August 2025
NamPower 2025. 250717006145: The application for the Environmental CLearance Certificate for the operation and maintenance of an existing Witvlei - abbatoir electrical reticulation system and associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as “energy distribution, transmission and generation” requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Witvlei – Abbatoir and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 23 June 2025
NamPower 2025. 250408005642: The application for the Environmental Clearance for the operation and maintenance of an existing Aussenkehr - Aussenkehr North and South electrical reticulation system including Aussenkehr Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Aussenkehr - Aussenkehr North and South electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 23 June 2025
NamPower 2025. 250409005661: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Kokerboom - Tses electrical reticulation system including Tses Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the existing Kokerboom - Tses reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 23 June 2025
NamPower 2025. 250424005743: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Lüderitz - Namibia Airports Company electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the Lüderitz - Namibia Airports Company reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 23 June 2025
NamPower 2025. 250424005744: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Lorelei - Orange River and Lorelei - Spitskop electrical reticulation system including associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for operation and maintenance of the Lorelei - Orange River and Lorelei - Spitskop including associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 23 June 2025
NamPower 2025. 250424005745: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Konkiep - Bethanie electrical reticulation system including Bethanie Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the Konkiep - Bethanie electrical reticulation system and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005651: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Keetmanshoop - Naute electrical reticulation system including Naute Dam base substation and Naute Dam booster 1 and other associated infrastructure.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for Keetmanshoop - Naute in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005640: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 66kv Aranos - Stampriet transmission line including Aranos substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for 66kV Aranos - Stampriet to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This transmission line runs from Aranos substation to Stampriet substation in Hardap region and is 76.9 km in length. The line is constructed with wooden H - Pole structures.

Monday, 26 May 2025
NamPower 2025. 250408005652: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Khurub - Noordoewer electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for the operation and maintenance of Khurub – Noordoewer reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005641: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 11kv Aus - Aus electrical reticulation system line and associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for 66kV Aus - Aus to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. The 11kV Aus - Aus power line is 16.9 km in length.

Monday, 26 May 2025
NamPower 2025. 250408005653: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 22kv Koichab T-off - Koichab electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for existing 22kV Koichab T-off - Koichab in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005643: The application to renew the Environmental Clearance Certificate for the operation and maintenance of an existing 132kv Gerus - Whale Rock transmission line including Whale Rock substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2018, NamPower obtained the ECC for the 132 kV Gerus - Whale Rock transmission line has since expired. NamPower would therefore like to apply for the ECC for 132kV Gerus - Whale Rock including Whale Rock Substation to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005654: The application to renew the Environmental Clearance Certificate for the operation and maintenance of the existing 132kv Kokerboom - Namib 1 and 2 transmission lines and other associated infrustructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2015 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 132kV Kokerboom - Namib transmission line. NamPower would therefore like to apply for the renewal of the ECC for 132kV Kokerboom - Namib line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005644: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 22kv Harib - Schonau distribution line.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for 22kV Harib - Schonau to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. The 22kV Harib - Schonau power line starts from Harib Substation and runs north-eastwards to Schonau in Warmbad area, //Karas region.

Monday, 26 May 2025
NamPower 2025. 250409005663: The application to renew the Environmental Clearance Certificate for the operation and maintenance of the existing Mariental - Gibeon electrical reticulation system including Gibeon Substation and other associated infrustructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the Mariental - Gibeon transmission line. NamPower would therefore like to apply for the renewal of the ECC for Mariental - Gibeon line to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This ECC also includes Gibeon Substation.

Monday, 26 May 2025
NamPower 2025. 250408005648: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Karas T-off - Karasburg electrical reticulation system including karasburg other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for 22kV Karas T-off - Karasburg to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. The powerlines from this reticulation system run from Karas T-off substation southwards to Karasburg Substation, Karasburg area, Warmbad substation and various supply points in //Karas region.

Monday, 26 May 2025
NamPower 2025. 250409005665: The application to renew the Environmental Clearance Certificate for the operation and maintenance of the existing 66kv Osona - Okahandja transmission line including Okahandja Substation and Ongeama Substation and other associated infrustructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Osona - Okahandja transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Osona - Okahandja line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005650: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Karas T-off - Grünau electrical reticulation system including Karas T-off substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for 22kV Karas T-off - Grünau and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250409005666: The application to renew the Environmental Clearance Certificate for the operation and maintenance of an existing 66kv Otjikoto - Tsumeb 1 and 2 transmission lines including Tsumeb Substation and other associated infrustructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2021 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Otjikoto - Tsumeb transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Otjikoto - Tsumeb transmission line to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.