Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 9 of 9
Friday, 20 September 2024
Chameleon Environmental 2024. 240415003216: Renewal application of the existing ECC (ECC - 01359): Proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia.
The existing valid ECC was issued for the proposed establishment of a bitumen storage and bitumen emulsion production facility in Arandis Industrial township. The products stored and produced are road surfacing material to be used for the upgrading rehabilitation and construction of the existing and new road infrastructure in the Arandis region.
Thursday, 16 May 2024
Chameleon Environmental 2024. 240227002886: Renewal of existing ECC for the proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia.

Proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia Nature of Activity: Storage and production of road surfacing material (bitumen and bitumen emulsions) Location of Activity: Erf 112, Arandis Industrial Township Scale and Scope of Activity: The bitumen storage and bitumen emulsion production facility is a small operation and designed as a closed unit. The storage and production facility has an actual footprint of approximately 500m². The site surface covers 1100m².

Tuesday, 1 November 2022
SLR Consulting 2022. 221017000128: Proposed three-dimensional (3D) seismic survey in Petroleum Exploration Licence 90 (PEL 90), Orange Basin, off the coast of southern Namibia.

3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.

Monday, 31 October 2022
SLR Consulting 2022. 221017000129: Renewal of Alten Solar Power Hardap (Pty) Ltd Environmental Clearance Certificate.

Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.

Monday, 31 October 2022
SLR Consulting 2022. 221014000087: Proposed meteorological mast and remote sensing campaign for the proposed Hyphen Hydrogen Energy Facility in the Tsau//Khaeb (Spergebiet) National Park, Namibia.

10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.

Wednesday, 22 June 2022
SLR Consulting 2022. APP-003899: ECC renewal application for exploration well drilling in Block 2913B, Orange Basin, Namibia.

TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.

Thursday, 18 March 2021
Chameleon Environmental 2021. APP-002291: Renewal application for the existing EEC for the bitumen storage and bitumen emulsion production facility in Arandis Industrial, Erongo Region.

Application for the renewal of the existing ECC that expires on 31 May 2021.

Monday, 6 July 2020
SLR Consulting 2020. APP-001119: Amendment application - exploration well drilling in Petroleum Exploration Licence 39 (PEL 39).

The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.

Thursday, 28 May 2020
SLR Consulting 2020. APP-001407: Environmental Performance Report and EMP.

For Groundwater Abstraction for industrial purposes.

Not found what you are looking for? Amend your search...