Proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia Nature of Activity: Storage and production of road surfacing material (bitumen and bitumen emulsions) Location of Activity: Erf 112, Arandis Industrial Township Scale and Scope of Activity: The bitumen storage and bitumen emulsion production facility is a small operation and designed as a closed unit. The storage and production facility has an actual footprint of approximately 500m². The site surface covers 1100m².
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
| Attachment | Size |
|---|---|
| 129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB |
| 129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB |
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
Application for the renewal of the existing ECC that expires on 31 May 2021.
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
For Groundwater Abstraction for industrial purposes.